Saturday, May 28, 2011

DT-zig-zag indicator

Rays of convergence with the changing fortunes of different time periods in various bars, said in one of these periods, there are holes in history. It is necessary to remove the quotes that period where there are gaps quotes, history and upload again.

Starting with 41 versions included DT-mode zig-zag. At 41, 42 versions of this regime is unstable.

Version
45 There were three modes DT-zig-zag. All three modes work with external zig-zag's. External zigzags have different algorithms to build a zig-zag's. We should use zig-zag and they belong to offer printing ZUP.

ExtIndicator = 6 - DT-zig-zag with the outside ZigZag_new_nen3.mq4
ExtIndicator = 7 - DT-zig-zag with the outside DT_ZZ.mq4 (developed klot)
ExtIndicator = 8 - DT-zig-zag with the outside CZigZag.mq4 (developed candidate)
ExtIndicator = 10 - DT-zig-zag swing from the outside Swing_ZZ.mq4

ZUP and zig-zag, and you should copy the folder with user indicators.
GrossPeriod - number of minutes to a time frame that is built on the testimony of DT-zig-zag.

For all three modes DT parameter is set high GrossPeriod time frames, from which the data used for construction of a zig-zag in this time frame.
In addition to specifying the parameters GrossPeriod zig-zag, and used:
minBars
ExtDeviation
ExtBackstep

For ExtIndicator = 6 parameters set the zig-zag minBars, ExtDeviation, ExtBackstep.
For ExtIndicator = 7 zig-zag parameters are set only minBars value.
For ExtIndicator = 8 zig-zag parameters set to minBars, ExtDeviation.
For ExtIndicator = 10 parameters set the zig-zag minBars.

Yellow stripes on the DT-zig-zag can be removed by selecting the color None Colors tab in the window changes the properties of their own indicators.

Initially used DT-zig-zag, which has developed klot. But now ZUP different algorithm is used to treat DT-zig-zag.

What is the DT-mode zig-zag.
Using GrossPeriod parameter is set timelines, expressed in minutes, in accordance with zig-zag that is built in this time frame.
GrossPeriod can take the following meanings: 5-15-30-60-240-1440-10080-43200. The corresponding deadlines: M5-M15-M30-H1-H4-E1-W1-MN

ZigZagHighLow - wondering, what points to make building patterns Pesavento, Andrews Fork arm, etc.
true - the extremes Bars
false - the zig-zag fractures.

Consider the examples.



The schedule drawn two ZUP_43_2 Preferences
ExtIndicator = 6
minBars = 12
ExtDeviation = 13
ExtBackstep = 34

The first indicator GrossPeriod = 240 points for yellow and selected tab width = 5 color change indicator. (5 color - the fifth tracer wad)
Color line zig-zag = Olive

A second indicator GrossPeriod = 60 points and pulled color OrangeRed, width = 1 points are on the label changes color indicator. (5 color - the fifth tracer wad)
Color line zig-zag = Aqua.

Number of yellow is 16 points. GrossPeriod = 240 corresponds H4. In one of the four sveche contains 16 candles with graphics M15. We used the same layout M15. That's the point of yellow candles indicate that the M15 schedule includes a candle in the graph H4 - the candle, which has a maximum zig-zag.
Red spots - four. GrossPeriod = 60 - corresponds hour shift.
In order to overlay testimony was different indicators, as shown in our example - red point penalties for yellow, it is necessary to comply with the order of connection indicators. First, connect the indicator with yellow spots. Then - in red.

An important feature of this mode. If we schedule a specific set of indicators switch from M15, for example, H4 - the second indicator with red dots will be displayed. He uses data from hour time frames, and we were transferred to four. A DT-mode zig-zag allows using data from high limits for construction of zig-zag under time frames. If a longer period of time data will be displayed.

Following the withdrawal of indicators shows the example discussed above, in the timeline:


Yellow and red dot help identify time frames, according to data that constructed the corresponding zig-zag.
For better orientation can all build on each time the frames are made in one color processing. Specifically, to the point of DT-mode zig-zag always painted on different timetables in different pre-defined, color.

Another important addition. When dealing with the regime of DT-zig-zag in a time frame GrossPeriod depth bids must be greater than the working period. If not, then immersion in the history of great depth than is available in GrossPeriod, zig-zag will make the wrong building.

No comments:

Post a Comment

Powered by Blogger.